Michigan Pipeline

This June 2020 photo, shot from a television screen provided by the Michigan Department of Environment, Great Lakes, and Energy shows damage to anchor support EP-17-1 on the east leg of the Enbridge Line 5 pipeline within the Straits of Mackinac in Michigan. Enbridge who provided the photos to the state of Michigan, last week said an anchor support on the east leg of the pipeline, right, had shifted. A judge has shut down the pipeline in Michigan's Great Lakes, granting a request from the state. The judge says Enbridge hasn't provided enough information to show that continued operation of the west leg of the twin pipeline is safe. (Michigan Department of Environment, Great Lakes, and Energy via AP)

DETROIT — A judge shut down an energy pipeline in Michigan’s Great Lakes on Thursday, granting a request from the state after the owner reported problems with a support piece far below the surface.

Enbridge Inc. has not provided enough information to Michigan officials to show that continued operation of the west leg of the Line 5 twin pipeline is safe, Ingham County Judge James Jamo said.

(Copyright © 2020 APG Media)

Load comments